Skip to Content

Texas Unveils $138 Billion 10-Year Transportation Plan: What It Means for El Paso

El Paso, TX (KVIA-TV)-This week, Governor Greg Abbott and the Texas Department of Transportation announced a new 10-year transportation plan with a projected total investment of $138 billion.

Lauren Macias Cervantes from Tx Dot El Paso is with us now to provide more information on what this means for El Paso.

Closures:


I-10 Widening West Phase 2

Monday, Aug. 31

9 p.m. – 6 a.m.

  • South Desert at Transmountain full closure

Detour: Traffic to use Spur 16 to Isela Rubalcava.

Crews will be working on asphalt placement patch repair.

Loop 375 Rehabilitation Project

Sunday, Aug. 30 – Thursday, Sept. 3

8 p.m. - 6 a.m. (Nightly)

  • Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternating lanes
  • Loop 375 (Border Highway) westbound off-ramp to Paisano (Exit 20) full closure
  • Loop 375 (Border Highway) westbound off-ramp to US-54 North and I-10 West one lane closure

Crews will be working on rip rap and guardrail.

Monday, Aug. 31 – Tuesday. Sept. 1

Daily, 6 a.m. – 8 p.m.

  • Loop 375 (Border Highway) westbound exit ramp to Paisano (exit 20) full closure
  • Loop 375 (Border Highway) westbound exit ramp to US-54 East and I-10 West one lane closure

Crews will be working on guardrail.

Road Repair

Sunday, Aug. 30

7 a.m. – 4 p.m.

  • Gateway North at Fred Wilson right lane closed

Monday, Aug. 31

8 p.m. – 6 a.m. (Night)

  • Gateway West at Geronimo traffic intersection complete closure.
  • Airway entrance ramp closed
  • Geronimo exit ramp closed
  • Turnaround at Buffalo Soldier closed

Follow detour in place

Concrete Work

Tuesday, September 1 – Friday, September 4

9 a.m. – 4 p.m.

  • I-10 westbound between Schuster and Executive right lane closed

Crews will be pouring concrete rip rap.

Guardrail Repair

9 a.m. – 4 p.m.

Monday, Aug. 31

  • I-10 westbound at Sunland Park right lane closed

Tuesday, Sept. 1

  • Loop 375 (Border Highway) between Padres and Yarbrough right lane closed

Wednesday, Aug. 26

  • US-54 South at Ellerthorpe right lane closed

Thursday, Aug. 27

  • US-54 northbound between Paisano and Alameda right lane closed

Maintenance

Monday, Aug. 31– Friday, Sept. 4

9 a.m. - 4 p.m.

  • Loop 375 (Transmountain) westbound between Tom Mays Park entrance and Paseo Del Norte left lane closed

Crews will be working on the shoulder.

  • US-54 North between Loop 375 (Border Highway) and Alameda alternate lane closures

Crews will be working on sealing joints.

  • US-54 South between Pershing and I-10 West two right lanes closed
  • US-54 North between I-10 West and Yandell right lane closed
  • Entrance ramp between CD Lanes and US-54 South closed
  • Ramp C, US-54 North to I-10 West, closed

Crews will be trimming trees.

  • I-10 West between Raynolds and US-54 North right lane closed
  • I-10 West between Airways and Geronimo right lane closed
  • I-10 West at Airways entrance ramp closed

Crews will be cleaning.

  • Loop 375 (Border Highway) eastbound at Paisano (Exit 66) complete closure
  • Doniphan entrance ramp to Loop 375 (Border Highway) eastbound closed

Crews and Signal Shop will be removing signs.

I-10 Landscape and Aesthetics Project

Monday, Aug. 31 - Friday, Sept. 4

Daily, 9 a.m. - 4 p.m.

  • I-10 westbound right lane closure between Lee Trevino Drive to Yarbrough Drive

Crews will be sealing joints and working on landscaping.

Montana Widening Project

Wednesday, Sept. 2; Thursday, Sept. 3

Daily, 9 a.m.-5 p.m.

  • Montana Avenue westbound left lane closure between Saul Kleinfeld Drive to Tierra Este Road

Crews will be working on the new bridge on Joe Battle Boulevard

Thursday, September 3; Friday, September 4

Nightly, 9 p.m.-5 a.m.

  • Montana Avenue eastbound closure from Leticia Street to Joe Battle Boulevard
  • The northbound to southbound U-turn along Joe Battle Boulevard will be closed.

Crews will be placing Continuously Reinforced Concrete Pavement (CRCP).

Horizon/Darrington Reconstruction Project

Monday, Aug. 31- Friday, Sept. 4

Daily, 8 a.m. - 5 p.m.

  • Horizon Boulevard east- and westbound alternating lane closures between Horizon Crossing Street, Thea Smith Drive, and Rodman Street
  • Darrington Road north- and southbound alternating lane closures between Kingston Road and Nunda Drive

Monday, Aug. 31 at 9 a.m.

  • Darrington Road northbound traffic switch from Pete La Rue Circle to Roslyn Drive
  • Northbound access to Pete La Rue Circle, U-Turn on Darrington at the intersection of Roslyn and Alderwood Manor Drive

Crews will be conducting electrical, concrete, sign, and landscaping work

Article Topic Follows: Local Focus
el paso
Nichole Gomez

Jump to comments ↓

Author Profile Photo

Nichole Gomez

Nichole Gomez is the producer and host of ABC-7 at 4.

BE PART OF THE CONVERSATION

KVIA ABC 7 is committed to providing a forum for civil and constructive conversation.

Please keep your comments respectful and relevant. You can review our Community Guidelines by clicking here

If you would like to share a story idea, please submit it here.