EL PASO, Texas (KVIA) -- Here is a list of road closures scheduled for Wednesday, October 25 for El Paso County and the City of Las Cruces. For updates in El Paso, click here.  (https://twitter.com/txdotelp)For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20)

Mesa Street Rehabilitation Project

Sunday, October 22 through Friday, October 27

9 p.m. to 6 a.m. (Nightly)

  • Mesa (SH-20) southbound between Sunland Park and Camille left lane closed.

Crews will be milling and replacing asphalt pavement.

North Mesa Street Lighting Improvement Project

Monday, October 23 through Friday, October 27

9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound between I-10 and Doniphan left lane closed.

Crews will be drilling for illumination foundations in the median.

Spall Repair Project

Wednesday, October 25

9 p.m. to 5 a.m. (Night)

  • I-10 eastbound between Raynolds and Geronimo three right lanes and Geronimo exit ramp closed.

District-Wide Signing Project

Monday, October 23 through Friday, October 27

9 a.m. to 4 p.m.

  • I-10 east and westbound between El Paso and Van Horn alternate lane closures.

Crews will be installing signs.

US-54 Realign Intersection at Stan Roberts and State Line Road Project

Monday, October 23 through Friday, October 27

9 a.m. to 4 p.m.

  • US-54 north and southbound at Stan Roberts shoulders closed.

Crews will be realigning the intersection.

Green Ribbon Project

Monday, October 23 through Friday, October 27

9 a.m. to 4 p.m.

  • Alameda (SH-20) east and westbound between Loop 375 (Border Highway) and Rio Vista left lane closed.
  • Doniphan (SH-20) east and westbound between Thorn and Borderland left lane closed.

Crews will be installing new landscape.

Traffic Control Stockyard and Horizon (FM-1281)

Monday, October 23 through Friday, October 27

8 a.m. to 4 p.m.

  • Horizon (FM-1281) and Stockyard north and southbound intersection right lane closed.

Crews will be working on traffic signal improvements.

Diamond Grinding on I-10 Project

Monday, October 23 through Saturday, October 28

7 a.m. to 7 p.m.

  • I-10 eastbound between Mile Markers 50 and 55 (Fabens area) left lane closed.

Crews will be grinding and grooving pavement.

Traffic Signal Improvements

Monday, October 23 through Friday, October 27

9:00 a.m. to 4:00 p.m.

  • Mesa (SH-20) and Resler intersection east and westbound right lane closed.
  • Montana (US-62/180) and McRae (FM-2316) intersection east and westbound right lane closed.

Crews will be removing concrete sidewalks, ramps, and curb.

Monday, October 23 through Friday, October 27

9:00 a.m. to 4:00 p.m.

  • Spur 601 and Loop 375 intersection east and westbound shoulder closed.

Crews will be locating utilities.

Maintenance

Monday, October 23 through Friday, October 27

9:00 a.m. to 3:00 p.m.

  • US-54 northbound between Altura and Cassidy two right lanes closed.
  • Pershing entrance ramp to US-54 north closed.
  • I-10 east and westbound between Trowbridge and Buffalo Soldier alternate lane closures.
  • I-10 eastbound Trowbridge entrance ramp closed.
  • I-10 westbound Airway entrance ramp closed.

Crews will be working on bridge.

EAST AREA OFFICE CLOSURES

Purple Heart Loop 375 Widening

Saturday, October 21 through Sunday, October 22

Daily, from 4:00 a.m. until 9:00 p.m.

  • Purple Heart Highway (Loop 375) southbound closure at Iron Medics
  • Iron Medics Entrance and Exit ramps will be opened.

Crews will be installing a culvert.

Sunday, October 22 through Thursday, October 26

Nightly, from 8:00 p.m. until 6:00 a.m.

  • Purple Heart Highway (Loop 375) southbound full closure between Spur 601 and Montana Avenue
  • Entrance and Exit ramps southbound between Spur 601 and Montana Avenue will be closed.
  • Spur 601 Northbound to southbound turnaround

Crews will be placing portable concrete barriers.

Sunday, October 14 through Friday, November 10

Continuous closure

  • Purple Heart Highway (Loop 375) northbound will be reduced to one lane between Montana Avenue and Spur 601
  • Entrance and Exit ramps northbound between Montana Avenue and Spur 601 will be closed.
  • Spur 601 Northbound to southbound turnaround

Crews will be working on widening lanes.

Sunday, October 8 through Friday, November10

Complete closure until further notice

  • Iron Medics Entrance Ramp.

Crews will be working on placing asphalt.

Wednesday, October 25 through Thursday October 26

Nightly, from 9:00 p.m. until 5:00 a.m.

  • Woodrow Bean Transmountain (Loop 375) Westbound and Eastbound full closure between Gateway South Blvd. and Paseo Del Norte Drive

Crews will be removing portable concrete traffic barrier

Sunday, October 22 through Wednesday November 1

Nightly, from 9:00 p.m. until 5:00 a.m.

  • Woodrow Bean Transmountain (Loop 375) Westbound and Eastbound full closure between Gateway South Blvd. and Paseo Del Norte Drive

Crews will be removing portable concrete traffic barrier.

Horizon Mill and Inlay Project

Sunday, October 22 through Tuesday, October 24

Nightly, from 8:00 p.m. until 5:00 a.m.

  • Horizon Boulevard (FM1281) north and southbound alternate lane closure between Gateway West Boulevard and Ashford Drive

Crews will be working on striping and miscellaneous repairs.

Monday, October 23 through Tuesday, October 24

Daily, from 9:00 a.m. until 4:00 p.m.

  • Horizon Boulevard (FM1281) north and southbound alternate lane closure between Gateway West Boulevard and Ashford Drive

Crews will be working on medians, striping and miscellaneous repairs.

Loop 375 Widening Project

Sunday, October 22 through Thursday, October 26

Nightly, 9:00 p.m. until 5:00 a.m.

Crews will be working on removing existing bridge overhang and installing bridge structures.

Sunday, October 22 through Wednesday, October 25

Nightly, 9:00 p.m. until 5:00 a.m.

  • Zaragoza (POE) Overpass 

Crews will be working on removing existing bridge overhang and installing bridge structures.

Sunday, October 22, Monday October 23, Wednesday October 25 and Thursday, October 26

Nightly, 9:00 p.m. until 5:00 a.m.

  • Loop 375 northbound main lane closure between Zaragoza (POE) Overpass and North Loop Overpass

Crews will be working on removing existing bridge overhang and installing bridge structures.

Monday, October 23 through Saturday, October 28

Daily 9:00 a.m. until 4:00 p.m.

Crews will be installing electrical, patching MSE wall, painting, and work zone entry.

Tuesday, October 24

Nightly, 9:00 p.m. until 5:00 a.m.

  • Americas Highway (Loop 375) northbound main lane closure between Yarbrough Overpass to North Loop Overpass

Crews will be working on installing signs.

Thursday, October 24

Nightly, 9:00 p.m. until 5:00 a.m.

  • Americas Highway (Loop 375) southbound main lane closure between North Loop Overpass to Padres Overpass

Crews will be working on installing signs.

Continuous closures until further notice

  • S Americas Avenue at Pan American Drive turnarounds in both directions will be closed
  • S Americas Avenue at Socorro Road turnarounds in both directions will be closed
  • S Americas Avenue at North Loop Drive turnarounds in both directions will be closed
  • S Americas Avenue northbound to southbound turnaround at Alameda Avenue will be closed
  • Loop 375 southbound to northbound truck turnaround at S Americas will be closed.

Crews will be widening LP 375 main lane bridge structures.

Paved Shoulders Project

Monday October 23 through Saturday, October 28

Daily from 6:00 am to 6:00 pm

  • Ascension Street southbound right lane and shoulder closure between Kentwood Avenue and Horizon Boulevard w/Truck Mounted Attenuator

Crews will be working on demolition of shoulder.

Monday, October 23 through Saturday, October 28

Daily from 6:00 am to 6:00 pm

  • Alameda Avenue (SH20) westbound right lane closures between Acala and Spur 148 w/Pilot Car

Crews will be working on paving operations.

I-10 Guardrail Upgrades

Monday October 23 through Friday, October 27

Daily 9:00 a.m. until 4:00 p.m.

  • I-10 East and westbound right lane closures near McNary area (MM 80-81)
  • I-10 East and westbound right lane closures between Horizon Overpass to Clint Overpass

Crews will begin removing guardrail.

CONTINUOUS CLOSURES

ADA Improvements Project

Friday, August 25 until further notice

Daily, from 9:00 a.m. until 5:00 p.m.

  • Alameda Avenue (SH 20) east and westbound alternating lane closures from Americas Highway (Loop 375) to Horizon Boulevard (FM 1281)

Crews will be removing sidewalks and ramps for ADA improvements.

Purple Heart Loop 375 Widening

Continuous until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be constructing north and southbound frontage road.

Passing Lanes Project

Monday, February 06 until further notice

Daily, from 7:00 a.m. until 5:00 p.m.

  • US 62/180 MM 78 to 94 east and westbound right and left lane and shoulder closure

Crews will be working on level up locations on non-widening sections. 

Median Concrete Barrier Project

Continuous until further notice

  • Montana Avenue (US 62/180) east and westbound complete left lane closure between RM 124 and RM 126 (Guadalupe Peak)
  • Traffic will be reduced to one lane in work areas.  

Closure is necessary for installation of median concrete barrier.

RM 652 Full Depth Rehabilitation Project

Continuous until further notice

  • RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line
  • Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation.

RM 652 Widening Project

Continuous until further notice

  • RM 652 continuous alternating east and westbound left lane closures between RM 1165 and 0.91 mile west of FM 3541
  • Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with 14-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation.

Please follow the detour signs in place on all projects.  All work is dependent upon weather conditions.

Article Topic Follows: Traffic

Jump to comments ↓

Author Profile Photo

Michael Courier

Multimedia Journalist

BE PART OF THE CONVERSATION

KVIA ABC 7 is committed to providing a forum for civil and constructive conversation.

Please keep your comments respectful and relevant. You can review our Community Guidelines by clicking here

If you would like to share a story idea, please submit it here.

Skip to content