Road closures in El Paso County, Las Cruces Thursday, January 18
EL PASO, Texas (KVIA) -- Here is a list of road closures scheduled for Thursday, January 18th for El Paso County and the City of Las Cruces. For updates in El Paso, click here. (https://twitter.com/txdotelp)
For a look at more information from TxDOT, click here. (https://www.txdot.gov/about/newsroom/local/el-paso.html) For updates in Las Cruces, click here. (https://www.lascruces.gov/CivicAlerts.aspx?CID=20)
Guardrail Repair Project
Thursday, January 18
9 a.m. to 4 p.m.
- I-10 westbound between Schuster and Executive right lane closed.
- I-10 eastbound between Sunland Park and Mesa Park right lane closed.
North Mesa Street Lighting Improvement Project
Monday, January 15 through Friday, January 19
9 a.m. to 4 p.m.
- SH-20 (Mesa) north and southbound between I-10 and Doniphan alternate lane closures.
- SH-20 (Mesa) north and southbound between Mesa and Sunland Park alternate lane closures.
Crews will be boring for electrical conduit, pouring drill shaft foundations, and potholing.
Traffic Signal Improvements Project
Monday, January 15 through Friday, January 19
9 a.m. to 4 p.m.
- SH-20 (Mesa) north and southbound at Resler intersection right lane closed.
- US-62 (Montana) east and westbound at McRae intersection right lane closed.
- Dyer (BU-54) north and southbound at Tetons intersection right lane closed.
- Zaragoza (FM 659) north and southbound at Rojas intersection right lane closed.
Crews will be boring for electrical conduit, placing ground boxes, and intercession safety.
Maintenance
Monday, January 15 through Friday, January 19
9 a.m. to 3 p.m.
- Loop 375 (Border Highway) eastbound between Fonseca and Zaragoza right lane closed.
Crews will be working on shoulder.
- Dallas entrance ramp to I-10 westbound closed.
- Missouri between Dallas and Ange left lane closed.
Crews will be working on barrier wall.
- I-10 eastbound between Sunland Park and Buena Vista right lane closed.
- CD lanes to I-10 eastbound entrance ramp closed.
Crews will be installing signs.
Loop 375 Widening Project
Saturday, January 13
Daily 9:00 a.m. until 4:00 p.m.
- Americas Highway (Loop 375) southbound main lane closure between Pan American Overpass
and Zaragoza Overpass.
- South Americas Underpass Truck (P.O.E) complete closure.
Crews will be pouring bridge deck.
Saturday, January 13 through Monday January 15
Continuous from 3:00 p.m. Saturday January 13 through 5:00 a.m. Monday January 15.
- Americas Highway (Loop 375) southbound left lane closure from Pan American Overpass to
South Americas Overpass.
Closure will allow bridge deck to cure.
Sunday January 14, to Thursday January 18
Nightly, 9:00 p.m. until 5:00 a.m.
- Americas Highway (Loop 375) southbound/northbound main lane closure between North Loop Overpass and Zaragoza (POE) Overpass.
- Alternating Socorro, Zaragoza, South Americas Truck (P.O.E) Underpass complete closure
Crews will be working on paving main lanes and installing bridge structures.
IH-10 Underpass/FM793 Project [Fabens Bridge Replacement]
Saturday, January 13
Continuous closures until further notice
- I-10 east/westbound shoulder closures Fabens (FM793) Underpass.
Crews will be placing barricades, barrier, and utility relocation.
Saturday, January 20 through Monday, January 22
Continuous from 5:00 a.m. Saturday, January 20, through Noon Monday, January 22
- I-10 Fabens (FM793) Underpass
Crews will be working on demolition of bridge.
Purple Heart Loop 375 Widening
Monday, January 15 through Friday, January 19
Daily, from 9:00 a.m. until 3:30 p.m.
- Purple Heart Highway (Loop 375) north and southbound left inside lane closure between Montana Avenue and Spur 601
Crews will be removing demo and hauling material.